HOME

MAX BREWER BRIDGE DESIGN BUILD
GEOTECHNICAL DATA COLLECTION

GEC provided the Geotechnical Data Report for the replacement of the Max Brewer Bridge that was included in the Design Build Request for Proposal (RFP) package.  The project included construction of a new 2400-ft long bridge over the Indian River and reconstruction of 1.2 miles of the A. Max Brewer Memorial Parkway and SR 406 in Brevard County.

< Previous 1 2 3 4 Next >

MAX BREWER BRIDGE DESIGN BUILD GEOTECHNICAL DATA COLLECTION

GEC provided the Geotechnical Data Report for the replacement of the Max Brewer Bridge that was included in the Design Build Request for Proposal (RFP) package.  The project included construction of a new 2400-ft long bridge over the Indian River and reconstruction of 1.2 miles of the A. Max Brewer Memorial Parkway and SR 406 in Brevard County.

 


< Previous 1 2 3 4 Next >

Project Gallery