HOME

FLORIDA’S TURNPIKE COLONIAL PARKWAY EXTENSION PD&E STUDY AND DESIGN
ORANGE COUNTY

GEC is the Lead Geotechnical Engineer for Colonial Parkway (project limits shown below). GEC is also providing contamination screening for the PD&E study. The project will construct new limited access toll lanes within the SR 50 right of way, along with reconstruction and capacity improvements to non-tolled SR 50. Design is scheduled to begin in July, 2019.

< Previous 1 2 3 4 5 6 7 Next >

FLORIDA’S TURNPIKE COLONIAL PARKWAY EXTENSION PD&E STUDY, AND DESIGN
ORANGE COUNTY

GEC is the Lead Geotechnical Engineer for Colonial Parkway (project limits shown below). GEC is also providing contamination screening for the PD&E study. The project will construct new limited access toll lanes within the SR 50 right of way, along with reconstruction and capacity improvements to non-tolled SR 50. Design is scheduled to begin in July, 2019.

 


< Previous 1 2 3 4 5 6 7 Next >

Project Gallery