GEC REPRESENTATIVE PROJECTS INCLUDE:

Lake Nona Medical City Master Infrastucture

GEC has served the City of Orlando for the past 5 years providing construction materials testing services for Lake Nona’s Medical City master infrastructure including key roadway, stormwater and utilities projects. Current GEC activity includes master infrastructure for the new planned Lake Nona housing subdivision, Laureate Park.

GEC Lake Nona Medical City project assignments have included:

 

  • Veterans Way
  • Innovation Way
  • Lake Nona South Phase I
  • Fire Station at Lake Nona Station No. 16
  • OUC South Lake Park Residential Phase 1A and 1B
  • Sanger Road Extension
  • Lake Nona Middle School South Entrance
  • City of Orlando South Lake Park Residential Phase 1A and 1B
  • Weller Blvd.
  • Nemours Parkway East
  • Exploration Way
  • Burnham Institute
  • OUC Lake Nona Gas Line
  • Veterans Way (South Park 1)
  • Lake Nona Boulevard
  • Brindle Chase Drive
  • Middle Crown Drive
  • Laureate Boulevard
  • Tavistock Boulevard East
  • Tavistock Boulevard West
  • Veterans Administration Medical Center (VAMC) Access Rd.
  • Parcel 14 Loop Road
  • Ashton Station Roads A and B
  • Tavistock Boulevard E Bridge
  • Lake Nona Generator Building #5
  • Ashton Station Demucking
  • Ashton Station Infrastructure

Top

City of Orlando Creative Village

GEC is the Geotechnical Engineer for the Creative Village design and development team, Creative Village Orlando, LLC.  The planned 68-acre community on the site of the former Orlando Arena will be the largest re- development project in the history of Downtown Orlando.

Creative Village will be centered on the theme of cutting edge technology, beginning with advanced technology educational institutions in concert with the University of Central Florida and Valencia State College.  In addition to educational facilities, the planned new technology hub will be home to residential neighborhoods, office, retail and public spaces created to lure knowledge workers and their families to live and work in a new creative environment.

In addition, GEC brings to the Creative Village team its in-depth knowledge of downtown development projects that include the following:

  • Lynx Central Station
  • SunRail Trackway and Stations
  • The Plaza Towers
  • The Vue at Lake Eola
  • 801 North Orange Avenue
  • The OUC Reliance Plaza HQ
  • Church Street Station Presidential Ballroom
  • First United Methodist Church
  • CNL Tower I

Top

 

GEC Downtown Orlando Development Experience

GEC project knowledge within the City of Orlando is extensive and spans 21 years of project experience.  GEC has earned the reputation for providing the project team with cost-saving solutions to complex site challenges and conditions.  GEC core services include geotechnical engineering for design and construction of deep foundations as well as environmental consulting in areas of potential chemical contamination.  GEC utilizes ground penetrating radar (GPR) survey for pavement and structural evaluation in addition to its standard construction materials testing services.

GEC Downtown Orlando Projects Resume:

  • SunRail Commuter Rail Station and Alignment
  • Orlando Utilities Commission (OUC) Admin. Headquarters Building
  • The PLAZA, 2.9 acre mixed use development, downtown Orlando
  • Marriott Downtown Orlando (formerly the Omni)
  • Church Street Station Presidential Ballroom
  • Orlando City Hall and Parking Garage
  • CNL Office Tower Headquarters
  • OUC Downtown Orlando Chiller Plant
  • OUC North Central Energy Building
  • Ground Penetrating Radar (GPR) Survey - Magic Events Center site
  • LYNX Downtown Orlando HQ and Central Station Transit Hub
  • City of Orlando Administrative Parking Garage (300 Liberty Street)
  • Ground Penetrating Radar Surveys for Orange Court Hotel Site
  • The VUE at Lake Eola Condominiums
  • The Jackson Condominiums, Thornton Park
  • The Grande Condominiums
  • Embassy Suites Hotel
  • Regions Bank Building
  • Downtown Orlando Post Office Renovation
  • Orange County History Center Plaza
  • City of Orlando Municipal Justice Parking Garage
  • LYNX LYMMO
  • Lowndes, Drosdick, Dostor, Kantor & Reed Building Expansion
  • Dr. Phillips House
  • Howard Middle School
  • SR 408 Widening
  • Interstate 4 Ultimate Downtown Bridges
  • I-4 Bridge Pilot Study
  • Eola Park Center Renovations
  • Pizzuti/Orlando City Center
  • DPAC Acoustical Investigation
  • FUMCO Wesley Re-development

Map of Downtown

Top

Lynx
LYNX Central Station

LYNX Parramore Bus Rapid Transit Design-Build

The Parramore Fixed Guideway Bus Rapid Transit (BRT) expansion project represents a 2.1-mile extension of the current Orlando LYMMO BRT system through the historic Parramore and Callahan neighborhoods and the proposed Creative Village redevelopment site.  Parramore BRT will connect key destinations west of I-4 with the urban core and the Central Florida region via LYNX Central Staton and future SunRail commuter rail service.  The project reconfigures the current northwest LYMMO from LYNX Central Station (LCS) as shown on the map below.

The Design/Build project team is led by ZMG Construction with participation by Creative Village Development, LLC, Cardno TBE and Baker Barrios Architects.  GEC is providing the geotechnical engineering for the project.

The budget for the Design-Build Project is $12,500,000.  The schedule includes a construction start date of August 2012, completion of construction by March 2013, and a revenue operation date of April 2013.

Top

Bellalago Residential Community

Bellalago Residential Community
Osceola County, Florida

GEC provided geotechnical engineering and contamination assessment services. Bellalago represents over 600 acres of internal lakes and waterways, parks and playgrounds along 1.2 miles of shoreline on Lake Tohopekaliga.
Voted "Best Community for the Metro Orlando area" by the 2004 Parade of Homes.
Avatar Properties

Top

Village Shops at Bellalago

GEC provided geotechnical engineering for planned $20 million shopping center on 13.9 acres just south of the entrance to Bellalago. Project location is the northeast corner of Pleasant Hill Road and Bellalago Drive in Osceola County.
Southeast Centers, LLC

Top

Portofino at Palm Coast Town Center
(Click picture to enlarge)

Portofino at Palm Coast Town Center
Flagler County, Florida

GEC provided site preparation and foundation design recommendations for twenty-three, four-story, multi-family Residential structures

Top

Marketplace at Seminole Towne Center

Marketplace at Seminole Towne Center

Phase I environmental assessment and geotechnical engineering for North American Properties. $100 million Suburban Power Center, located at Interstate 4 and S.R. 46. The 500,000 sq. ft. Marketplace adjacent to Seminole Towne Center is anchored by SuperTarget*, Circuit City, Old Navy and Sports Authority among others.
North American Properties

Top

 

*In addition, GEC has provided geotechnical engineering for these Target Store locations throughout Florida:

Super Target, Kissimmee West, Osceola County
Super Target, Millenia Mall, Orange County
Super Target, Lantana, Palm Beach County
Super Target, Boynton Beach, Palm Beach County
Oakbridge Center Lakeland, Polk County
Lakeland South, Polk County
Vero Beach, Indian River County
Merritt Island, Brevard County
Turkey Lake Road, Orange County
Hunters Creek, Orange County
Northwood Center, Pasco County
Port Orange, Volusia County
Lantana - Wellington South, Palm Beach County
Royal Palm Beach, West Palm, Palm Beach County

Stevens Plantation
(Click on picture to enlarge)

Stevens Plantation
St. Cloud, Florida

GEC provided geotechnical consulting engineering for site infrastructure, access roadways and ponds for planned 540 acre residential and commercial development
Dufresne-Henry

Top

Tavistock House
(Click picture to enlarge)

Tavistock House
Tavistock Group Corporate Headquarters
Isleworth, Florida

New corporate 18,000 sq foot headquarters building which opened in March, 2006. Designed by Bloodgood Sharp Buster Architects and Planners, the Tavistock House was awarded a Grand Aura Award for design excellence.

Top

Windermere Financial Center
(Click on picture to view
rendered pictures)

Windermere Financial Center

GEC provided geotechnical engineering recommendations for this 3-story building with a planned footprint area of 35,000 square feet. The Windermere Financial Center is located at Conroy and Apopka-Vineland Roads
Windermere Financial Center, LLC

Top

Shades of Green Resort Expansion

Shades of Green Resort Expansion
Walt Disney World, Orange County, Florida

Expansion of existing hotel/resort complex to include 283,000 sq. ft., 4 and 5-story hotel structure, public spaces, restaurants and retail/specialty shops. Also included, 5,500 sq. ft. main restaurant facility and 596-car, 4-story parking garage structure, 183,000 sq. ft. in size. KBJ Architects

Top


(Click picture to enlarge)

Millenia Park One Office Building

6-story, 158,000 square foot office building for St. Joe Company. Located south of Orlando near the I-4/Conroy Road Interchange. Foundation: shallow spread footings

Top

Pembrook Commons Office Buildings

GEC provided geotechnical engineering for two, 4-story office buildings (11,965 sq ft each) in Maitland located off Keller Road.

 

 

 

 

 

 

 